Blog

FAME Department Conversion

The FAME system was updated June 29, 2021 to replace the Legacy Department with the People Soft Department. You will need to use the People Soft Department for report criteria […]

By Eric Schmidt | Uncategorized
DETAIL

Year-End Closing Schedule FY21

Please take a moment to review our fiscal year-end processing deadlines and share with appropriate staff.  Following is the schedule for fiscal year-end close:   Friday, June 18 Deadline for […]

By Eric Schmidt | Uncategorized
DETAIL

DAR Enterprise Service Disruption: Thursday 5/20 5:30am-7am

On Thursday 5/20 between 5:30am-7am, the DAR IT team will continue efforts of relocating physical network connections and replacing cabling inside the DAR server racks in the Boyd datacenter.  During […]

By Emily Clary | Uncategorized
DETAIL

DAR Enterprise Service Disruption Thursday 5/13 6am-7am

On Thursday 5/13 between 6am-7am, the DAR IT team will be relocating some physical network connections and replacing some cabling inside the DAR server racks in the Boyd datacenter.  During […]

By Eric Schmidt | Uncategorized
DETAIL

FAME Downtime on April 26th at 5:30pm

UPDATE: As of 9:10 AM, FAME system maintenance has now been completed. Thank you for your patience. If you are experiencing any issues, please reach out to askit@uga.edu for assistance. […]

By Eric Schmidt | Uncategorized
DETAIL

FY22 Spending Budget Report

UGA Foundation FY22 spending allocations for endowments are now available on the FAME Campus Reports Dashboard.  The report is located under the Endowment Spending Reports tab, titled “FY22 Spending Budget […]

By Eric Schmidt | Uncategorized
DETAIL

Gift Accounting: 2020 Year-end Processing

An important message regarding the UGA Foundation’s year-end gift processing deadlines:   Over the holidays, the best way for donors to be sure their gift is posted in 2020 is […]

By Eric Schmidt | Uncategorized
DETAIL

Campus Wide Network Maintenance 

Campus Wide Network Maintenance  UGA will conduct campus-wide network maintenance on Saturday, Oct. 24. Expect network interruptions between 6 a.m. and 6 p.m. This will affect the availability of all DAR computing services.

By Eric Schmidt | Uncategorized
DETAIL

FY21 Year End Closing Schedule

Following is the schedule for fiscal year-end close:

By Eric Schmidt | Uncategorized
DETAIL
TOP